Mud Dredging Work in Mampang River Has Reached 70 Percent
Reported by Aldi Geri Lumban Tobing | Translated by Nugroho Adibrata
The mud dredging process in Mampang River as long as one kilometer starting from Pasar Jagal Warung Buncit until Jalan Pondok Jaya, Mampang Prapatan, South Jakarta has reached 70 percent.
It only leaves more or less about 200 meters to Pondok Jaya
"It only leaves more or less about 200 meters to Pondok Jaya," expressed Jakarta Water Resources (SDA) Agency Head, Juaini Yusuf, Friday (11/20).
He explained two amphibious excavators had been operated to dredge up mud from the river. Sedimentation and river narrowing had made the area around Mampang River often flooded when the water flow was high.
Central Jakarta Continues to Optimize Flood MitigationThat was why it was done to accommodate water in large quantities when rain poured. "The river has six meter width thus we operate two excavators. So we dredge up the mud up to five meters from the surface," he stated.